
Sales Diagnosis · Module 2 of 4
The Miss: Attribute the Gap, Protect the Strength, Fix What's Recoverable
You missed the quarter by $1,560k, and the room has already decided why: the win-rate slipped, so fix win-rate. But a miss is never one thing — bookings are Opportunities × Win-Rate × Deal-Size, and the plan and the actual differ on all three. Decompose the gap and the story inverts: opportunities fell 20% and cost you $1,495k, deal-size fell 10% and cost $708k — but win-rate actually ROSE 10%, a $642k tailwind. The one lever the room wanted to fix is the one that's working. The aggregate $1,560k miss hides a $2,203k headwind masked by that strength; attack win-rate and you spend the quarter on a lever with nothing to recover ($0), while the usual way to 'raise' it (tighten qualification) shrinks your biggest headwind. And the biggest cause isn't the best fix: opportunities did the most damage, but pipeline has lead time — only $299k of it recovers this quarter — while deal-size is a smaller headwind but a fast, disciplined win ($566k recoverable now). So attribute the gap (exactly, no double-counting), protect the strength, and put the recovery quarter on the biggest RECOVERABLE lever — deal-size now, pipeline rebuild sequenced for next. Then the reads move: give pipeline a fast source and it becomes the best fix; let win-rate fall and the strength flips to a $1,285k headwind and the whole plan changes. This is the diagnostic seat's second question — after finding the binding constraint, attribute the shortfall to the lever that actually caused it, and fix what you can move.
0 of 55 items completed0%~109 min remaining
Material · 55 items